
University of Michigan, Weiser Hall
Michigan, USA
Project details
Client
University of Michigan
Duration
Jan 2013 – Apr 2018
海角视频 provided by 海角视频
Advisory, Higher education consulting, Strategy and operating model design advisory
The University of Michigan commissioned 海角视频 to help prepare for the renovation of Weiser Hall (formerly the Dennison Building). Located in the heart of central campus, Weiser Hall reopened in fall 2017 as a home to a number of interdisciplinary and internationally-focused units within the College of Literature, Science, and the Arts.
海角视频 led an innovative strategy development process to discuss workplace trends to determine a programmatic direction for the building and elaborate on the vision for the 鈥渨orkplace of the future鈥.
Challenge
The University envisioned the facility as an 鈥渁cademic building of the future鈥 that brings together international and interdisciplinary centers to share spaces, services, and ideas in a new kind of workplace.
They wanted to establish a new building planning process for the campus that begins with a leadership vision and engages stakeholders creatively and strategically. The University commissioned 海角视频 to help prepare for the renovation of Weiser Hall.

Working with students, faculty, and staff 海角视频 led an innovative strategy development process to elaborate on the vision for the workplace of the future. Image: 海角视频.
Solution
Working with students, faculty, and staff at the University鈥檚 College of Literature, Science, and the Arts, 海角视频 advisors led an innovative strategy development process including a study trip to a range of academic and corporate facilities, a series of workshops to discuss workplace trends and elaborate on the vision for the 鈥渨orkplace of the future,鈥 and a scenario planning process to determine a programmatic direction for the building and its spaces.
In one workshop exercise, participants used color-coded squares to create a diagram of spaces and new services on a cross-section of the building, mapping the stacking diagram and adjacencies in real-time.
In parallel, our strategy and operating model design experts also led a service design taskforce to develop the service model for the building to establish a sense of where and how activities like advising, event programming, and technology support would happen.
These activities culminated in a design brief that described the vision, space needs, space allocation/configuration, and service model for the building. Strategic solutions included a ground floor service hub for the building with informal learning spaces, roving staff, and a single service point; multi-floor staff clusters across two or three floors in which units are grouped together according to function, not organization, with open assigned desks and shared meeting rooms and coffee areas; collaborative spaces distributed throughout the building; and distributed informal learning spaces and food services to support student life in the building.
The modular, flexible workplace strategy allows for changes in academic units and their work. We piloted the strategy with some of the groups and served as strategy advisor as design and implementation began.
brightspot (now 海角视频) helped us imagine a future that was highly flexible and collaborative using a planning process that was entirely new to the campus and was exactly what our Dean and Provost were looking for.
Bob Johnston, Former Director of Facilities and Operations, College of Literature, Science, and the Arts, University of Michigan
Value
Weiser Hall opened in 2018 to great success. 海角视频鈥檚 post-occupancy evaluation revealed 75% to 80% user satisfaction with the space, technology, and services as well as significant productivity gains, saving occupants an average of 4.26 hours per week compared to their previous work environments.












