海角视频

UC Santa Barbara, San Joaquin Villages, Calaveras and Ramona Courts

Santa Barbara, CA, USA

Project details
Client

University of California Santa Barbara

Architect

Kevin Daly Architects

海角视频 provided by 海角视频

Building services engineering (MEP), Lighting design, Sustainability

Designed by Kevin Daly Architects, the San Joaquin Villages Calaveras and Ramona Courts project comprises 45,000ft2 2 and 3-bedroom low rise apartments including study rooms, lounges, kitchens, and ancillary spaces. The apartments are connected by external circulation and community spaces to encourage interaction throughout the day.

A 25,000ft2 din颅ing com颅mons serves the entire stu颅dent pop颅u颅la颅tion of the broader San Joaquin hous颅ing com颅plex that sits at the northern part of campus.

Challenge

The challenge on this project was to incorporate sustainable strategies that targeted LEED Platinum certification throughout the complexes. We needed to consider how to successfully reduce energy and water consumption to achieve the client鈥檚 aspirations.

UCSB San Joaquin Villages Calaveras and Ramona Courts
Image: Alex Nye

Solution

The Calaveras and Ramona Courts project achieved a combined measured site EUI (kbtu/sqft) of 25 (electricity and natural gas) between June 2017 and August 2018. This represents a 57% savings compared to the Energy Star Portfolio Manager Baseline for University Residence Halls. The project mechanical systems were designed to optimize occupant comfort and minimize energy use. The climate of Santa Barbara is ideal for passive cooling and therefore no active cooling is used in any of the living spaces, recreation areas, or study rooms.

Building materials were also carefully selected, such as resilient sheet flooring, which is comprised of 50% post-industrial recycled material. Municipal recycled water is treated and conveyed to the entire project site, providing 100% of the site鈥檚 annual irrigation needs with 2,722,934 gallons of non-potable water. A total 14 tons of waste were diverted from the landfill.

Beyond reduction in energy and water consumption, the project鈥檚 health-focused living spaces and amenities were designed with the goals of reducing embodied and operational carbon and protecting and restoring the surrounding wetlands ecosystem.

UCSB San Joaquin Villages Calaveras and Ramona Courts
The new energy efficient apartment buildings are formed to encourage connectivity between students. Image: Alex Nye

Value

The design team鈥檚 drive to meet UC Santa Barbara鈥檚 goals led the project to achieve LEED Platinum for all new buildings, and a pending Gold Certification for LEED Neighborhood Development, the first in the University of California System.

Awards

2019

CIBSE Awards Shortlist, Project of the Year – International

2018

AIA|LA 2018 Residential Architecture Awards, Multifamily Residential Citation Award