3 Glass Wharf
Bristol, UK
Project details
Client
Salmon Harvester Properties Ltd
Architect
Darling Architects
Duration
Completed in 2018
海角视频 provided by 海角视频
Acoustic consultancy, Building 海角视频 Engineering (MEP), Sustainability
Featuring a highly decorative facade, incorporating a unique seven storey art installation, the design of 3 Glass Wharf was inspired by the site鈥檚 previous life as a glass works. Its elegant floor-to-ceiling glazing frames views over the flourishing Temple Quarter of the city.
The environmentally-friendly space is home to more than a thousand HMRC employees who benefit from sleek new amenities and enjoy a prime location next to Bristol Temple Meads train station.
Challenge
The accommodation provides BCO 2014 specification CAT A space. The highly sustainable new offices have achieved a BREEAM rating of 鈥楨xcellent鈥.
海角视频 was appointed as the at the end of RIBA Stage 2. A review of the concept established that the design did not meet BCO requirements in relation to vertical transportation, and the concept had other shortcomings in respect of services distribution strategies and resilience.
Our specialists also identified that due to the building鈥檚 proximity to the railway, there was a significant risk of glare impacting on Network Rail.
Solution
Our engineers made certain that sustainable design principles were used in all aspects of the building services solution, ensuring it will be highly efficient.
The structural solution for the eight storey building is post tensioned cast in-situ concrete, incorporating down stand beams. Our experts carefully coordinated the building services with these beams, which are necessary to support the structure鈥檚 large spans and cantilevered balconies.

After undertaking the design review, we made significant changes to the Vertical Transportation (VT) strategy and primary distribution strategies to make the building more resilient. We then produced a set of detailed performance design documents for tender. We also re-assessed the heating strategy and created a more suitable design for the developer, which resulted in a significant cost saving. This required an amendment to planning regarding energy.
Having identified the glare risk associated with the extensive glass facade, our prepared a glare assessment. This supported discussions with Network Rail when agreeing acceptable levels of reflectance from the glass, so as to minimise the impact of glare on train drivers on the adjacent railway.
海角视频 went on to act on behalf of the client to review the contractor鈥檚 developed design and liaise with HMRC Cat B designers to ensure that the Cat A design was capable of supporting the final requirements of HMRC.
Value
With its striking facade and ideal location next to Bristol鈥檚 main railway station, 3 Glass Wharf completes development fronting the floating harbour and brings both opportunity and ambitious energy to the city鈥檚 regenerated Temple Quarter.
Awards
2021
Bristol Property Awards, Best Commercial Development: Winner